Gwel y Mynydd, Waunfawr (2 Phases)

Groundworks packaged awarded for the development of 17 3 and 4 bedroom homes. Package includes site preparation, site engineering, road works - tarmac prep, services, trenches, BT mains, road crossings, Section 278 works, pavements, kerbs, edgings, surface water and foul main drains, car parks, excavation of foundations and garages, block and beam flooring, plot drainage (surface water, foul, manholes), Stage 2 works - slabbing, driveways, edgings, paving, topsoil gardens and gravel borders.

Initial Contract Awarded: January 2010